PSA016OK426S, EMAS, Vacek COMUTATOR switch, 4 positions, 45 ° / 16A
PSA016OK426S EMAS - special cam switch, 400V AC, 16A, IP54. Technical specifications, use, installation and selection of the correct variant.
Rate 24,43 CZK per 1 EUR. Prices are indicative, invoicing is in Czech crowns.
Selection of starting switch by engine, network and working conditions.
PSA016OK426S EMAS - special cam switch, 400V AC, 16A, IP54. Technical specifications, use, installation and selection of the correct variant.
PSA020MS335S EMAS - special cam switch, black, 20 A. Technical specifications, use, installation and selection of the correct variant.
PSA025MS335S EMAS - special cam switch, black, 25 A. Technical specifications, use, installation and selection of the correct variant.
Prices include the recycling fee.
A star-triangle switch should be selected as part of the design for the specific motor starting. It is not a universal replacement for a regular switch or a means to connect any motor to any network. The data of the motor, the character of the driven machine, and the detailed contact program determine it. The presence of three positions alone does not prove the correct runout function.
The offer includes EMAS PSA020MS335S and PSA025MS335S. EMAS describes PSA020MS335S as a three-phase switch of a star-triangle with an angle of 60 ° and a face of 48 × 48 mm.e 20 A and AC21A. From this value it is not possible to determine separately the allowed kilowatts of the engine; for the intended run the corresponding engine switching value is required.
The full code has more significance than the notation on the handle. It is necessary to complete the transition between connections, not just the final states. When comparing replacements, base it on the production diagram and machine documentation. A manual controller does not take the function of motor protection or automatic monitoring of runout.
Schneider Electric explains the relationship of voltage and winding connection: at star, it falls on the line voltage divided by √3, at triangle, the entire line voltage. For star-triangle runout, the motor must allow final operation in triangle at the voltage of the network. The exchange of Δ/Y data can mean inadmissible line voltage.
For clarity, compare two labels in a network with line voltage 400 V: motor A has Δ/Y 400/690 V, motor B Δ/Y 230/400 V. For motor A, the final triangle corresponds to the mains voltage; at star during runout, it falls on the line voltage divided by √3 ≈ 231 V. For motor B, the subsequent triangle would mean 400 V on the line voltage intended for 230 V, and this combination is not appropriate. It is an explanation of the label, not a wiring guide.
Voltage check is just a first check. Technical guide Schneider Electric to start- triangle Requires access to all six stator winding terminals and warns about approximately one-third of the torque range compared to direct three-phase operation. This physical relationship does not indicate the switching contacts of EMAS products.
Choose your own supplementary example: available torque at direct three-phase operation 90 Nm, required load torque at the considered point 40 Nm. The 90/3 = 30 Nm in the star is not enough. Confirmation of the appropriate voltage does not confirm the operation. In reality, the moments and rotations including reserve for acceleration are compared, not just single numbers.
For the project, prepare the motor label, load characteristic, required start frequency, and transition conditions. The time of the operation cannot be determined from the current of the starter. The expert must design protections and assess the transition sequence. Mechanical arrangement and the box should be handled with accessories; spatial conformity alone does not demonstrate electrical suitability.
No. The conditions set out the design of a particular drive and its verification. Too early or disproportionately long a run is not solved simply by estimates.
No. He would have to have an explicit contact program and switching parameters. Differences of functions explain the overview Vacuum cleaners.
We need technical cookies for the cart and checkout to work — these are always used. Analytics cookies show us which pages people look for and where they get lost, and help us improve the shop. We only use them if you allow it. More in the data processing policy.
Choose which cookies we may use. You can change your choice at any time.
They keep the cart contents, your login and selected language, and protect forms from abuse. An order cannot be completed without them, so they are used even without consent.
Google Analytics shows us traffic and behaviour on the website in aggregated form. This tells us which pages are not working for people. We do not identify anyone from this data.