ECH7700-SM-RS, ENDA, programmable counter and tachometer, 72×72mm, 10–30VDC/8–24VAC, RS485

Cat. no.: ECH7700-SM-RS

ENDA ECH7700-SM-RS can work as a pulse counter or tachometer. The counter supports selection of PNP/NPN and encoder input; the power supply of this variant is 10–30VDC/8–24VAC. The RS version…

On request
204,69 €
excl. VAT · 247,68 € incl. VAT

Prices include the recycling fee.

Time relays and counters

When designing a simple control, first determine what ends the working step: the elapse of time, reaching a number of events or operator intervention. A fixed delay may suit ventilation, while a batch of pieces needs information about the actual passage of material. Also write down the conditions for interruption and restart. Without them, even a correctly selected time range does not guarantee the required behaviour of the assembly.

Decision: time interval or number of events?

For setting with a scale, continue to the category Analog Time Relays. Displaying and entering time are covered by Digital Time Relays. Batching by pulses and frequency evaluation belong to Digital Counters. Decide according to the input information that the process actually provides.

Manufacturer EMAS in the RZ1 series distinguishes analog timers, digital timers and digital counters. The setting method is therefore not an indication of the output type. A digital display alone does not mean a transistor output, and analog setting is not a promise of a 0–10 V signal.

Principle: separate the power supply, command and output

Write three separate pieces of information into the specification: what powers the device, what starts the measurement and what it should control once the condition is met. For timing, define the unit and range; for counting, the meaning of one valid pulse. Then determine whether a further command ignores, restarts or extends the step in progress. Verify this response in the diagram of the specific function, not by the word "multifunction" alone.

For example RELPOL RPC-1MA-UNI has ten time functions and one changeover contact. The number of modes therefore cannot be confused with the number of independently controlled outputs.

Mounting and link to the controlled load

Before replacement, compare the full code, the terminal diagram, the mounting version and the space for the cables. For a plug-in device, check the intended socket and its wiring; the same number of pins is not a basis for blind replacement. The wiring record should also include the common conductor of the control inputs, so that service does not have to guess its meaning afterwards.

Choose the output according to the specific load and switching frequency. If the control is to be linked to a motor circuit, also assess Contactors and motor protection. A current specified without the type of load is not enough to decide on the entire assembly.

Diagnostics: verify the entire sequence of states

During acceptance, record the state before the command, during the measurement, after reaching the limit and after a reset. Separately test a power failure and the return of voltage. Retaining the preset, retaining the current value and automatic continuation are different requirements; each needs its own verification. An illuminated output indicator also does not replace checking the actual response of the connected load.

Author's model example: time versus pieces

Consider an ideal conveyor with one piece passing every two seconds and a requirement for twelve pieces. From the first to the twelfth passage, eleven intervals elapse, i.e. 22 seconds. If the timing starts one interval earlier, the result is 24 seconds. Stopping the conveyor changes the relationship further. The example shows the need to define the starting event; the numbers are the author's and are not a product parameter.

FAQ

Is it enough to copy the time from the display when replacing?

No. Also record the unit, function, triggering method and response to reset. The same displayed value may represent a different sequence in another configuration.

Is the number of pulses the number of relay operations?

Only if you explicitly design the application that way. When batching, the output may respond only to the whole batch. The mechanical or electrical life of the contacts is therefore not a promised number of produced pieces or machine working cycles.