Phone +420 774 723 123 Cart · 0 · empty

Distribution Bars

Distribution bridges for splitting neutral and protective conductors. Choose by number of positions and cross-section.

Filters
Found 4 products
IN STOCK

Bridge PE7, Eleman, PE distribution bridge, 7×16mm², 63A, IP00, for DIN rail

Cat. no.: Můstek PE7

Bridge PE7 (Eleman): PE distribution bridge, 7×16mm², 63A, IP00, for DIN rail. For building the terminal strip and identifying the correct accessories.

In stock 5 or more pcs
0,74 €
excl. VAT · 0,89 € incl. VAT
IN STOCK

Bridge N7, Eleman, N distribution bridge, 7×16mm², 63A, IP00, for DIN rail

Cat. no.: Můstek N7

Bridge N7 (Eleman): N distribution bridge, 7×16mm², 63A, IP00, for DIN rail. For building the terminal strip and identifying the correct accessories.

In stock 5 or more pcs
0,74 €
excl. VAT · 0,89 € incl. VAT
IN STOCK

Bridge N12, Eleman, N distribution bridge, 12×16mm², 63A, IP00, for DIN rail

Cat. no.: Můstek N12

Bridge N12 (Eleman): N distribution bridge, 12×16mm², 63A, IP00, for DIN rail. For building the terminal strip and identifying the correct accessories.

In stock 5 or more pcs
1,07 €
excl. VAT · 1,29 € incl. VAT
IN STOCK

Bridge PE12, Eleman, PE distribution bridge, 12×16mm², 63A, IP00, for DIN rail

Cat. no.: Můstek PE12

Bridge PE12 (Eleman): PE distribution bridge, 12×16mm², 63A, IP00, for DIN rail. For building the terminal strip and identifying the correct accessories.

In stock 5 or more pcs
1,07 €
excl. VAT · 1,29 € incl. VAT

Prices include the recycling fee.

Bridging blocks

This category offers N7, PE7, N12 and PE12 listed in the catalogue under the ELEMAN brand. These are separate distribution terminal blocks, not plug-in combs for adjacent SUPU modular terminals. When ordering, therefore distinguish a bridge as a complete connection part and a jumper as an accessory of a specific terminal series.

Several connections to one common node

U PE7 in the ELEMAN documentation one pole, seven connection points, copper conductors and mounting on a mounting rail are stated. The offered N12 has twelve points. These numbers express connections of a common node, not separate circuits.

A distribution terminal block simplifies clear termination of several cores with the same function. In the design, however, first determine which conductors may actually form a common node. For example, neutral conductors belonging to separate residual current devices must not be arbitrarily connected by a common bridge. Colour distinction helps orientation; it does not replace the electrical diagram.

An uncovered part requires a suitable location

PE7 and the stated N12 are uncovered in the range, with protection IP00. The outer enclosure and the arrangement of the control cabinet must therefore provide the required protection against contact; the properties of covered variants cannot be transferred to these products.

Also the manufacturer ELCON for PE7 explicitly states protection IP00 and use under a cover. When designing, therefore separate the properties of the part itself from the protection provided by the finished enclosure.

The mounting rail ensures the position of the part, but does not by itself prove the electrical connection of the protective circuit. For PE versions, deal with the actual conductive path and its continuity. Use the terminal block according to its intended function, not just according to its green or blue colour. When choosing the location, keep access to all screws and the possibility of removing an individual conductor without damaging neighbouring cores.

Fine strand and ferrule

For this uncovered version, ELEMAN describes the screw bearing directly on the conductor. A finely stranded core requires a ferrule and a smaller connectable cross-section than the stated maximum for a solid conductor. Therefore compare the specific termination with the documentation of the selected type; do not regard the figure 16 mm² as a general permission for any strand with a ferrule.

Before tightening, check that the screw loads the correct area of the metal termination, not the plastic collar. The length of the ferrule must match the depth of the contact. Do not add two different cross-sections under one screw without the manufacturer's explicit specification. Choose the tightening torque according to the specific part; greater force does not automatically mean a better connection.

Model of the number of connections needed

Our own model of branching one permitted common node counts on one supply, eight outputs and two spare points. The requirement is 1 + 8 + 2 = 11 points. The seven-point version is therefore not enough, the twelve-point one leaves one more free position. This calculation only deals with the number of separately connected ends, not the current-carrying capacity or the suitability of the node for a specific protective measure.

For the current assessment, consider the entire assembly. The supply connection may carry the sum of the currents of several branches and become the limiting point even when the individual outputs are lightly loaded. The parameters of the bridge, supply, conductors, protection and conditions inside the enclosure are decisive. Neither the number of openings nor the largest connectable cross-section replaces this check.

FAQ

Can this bridge be used to connect SUPU modular terminals?

It is a different design element. Choose accessories for modular assemblies for the relevant series in the overview Terminals and terminal blocks. A plug-in bridge must match the series, pitch and contact shape; the same current or conductor cross-section is not proof of compatibility.

Does PE mean an automatic connection to the DIN rail?

Do not infer this from the name or colour. The protective function depends on the design and wiring of the specific terminal block. A mounting bracket and an electrical contact are two different things.

Cookies on this website

We need technical cookies for the cart and checkout to work — these are always used. Analytics cookies show us which pages people look for and where they get lost, and help us improve the shop. We only use them if you allow it. More in the data processing policy.