Modular Switches

Modular solid state switches (semiconductor, MOSFET and thyristor) for DIN rail for silent and frequent switching of loads. Choose by load type, current, number of channels and control.

Filtry
Znaleziono 4 produktów
−15 % NASZA PORADA DOSTĘPNY

JR-4K, TECHNOLINE, four-channel contactless thyristor AC switch, SCR, 230VAC/3.15A

Nr kat.: JR-4K

JR-4K TECHNOLINE – four-channel contactless thyristor AC switch, SCR, 230VAC/3.15A. Key data: JR-4K, SCR - thyristor, 4. Exact technical data for selecting the switching module type.

Dostępny 5 i więcej szt.
17,16 € 20,18 €
bez VAT · 20,76 € z VAT
−15 % NASZA PORADA DOSTĘPNY

JR-4J, TECHNOLINE, four-channel MOSFET switching module for DC loads, PNP, 24VDC, 5A/channel with resistive load

Nr kat.: JR-4J

JR-4J, TECHNOLINE: four-channel MOSFET module with PNP outputs for loads 12–24VDC; control 24VDC, resistive load up to 5A/channel.

Dostępny 5 i więcej szt.
17,89 € 21,04 €
bez VAT · 21,64 € z VAT
−10 % NASZA PORADA DOSTĘPNY

JR-4L, TECHNOLINE, four-channel relay switching module for PLC, 24VDC, 10A/250VAC

Nr kat.: JR-4L

JR-4L, TECHNOLINE, four-channel relay switching module for PLC, 24VDC, 10A/250VAC. Relay interface JR-4L converts four PLC output signals 24VDC into independent relay contacts.

Dostępny 5 i więcej szt.
25,55 € 28,39 €
bez VAT · 30,91 € z VAT

Ceny zawierają opłatę recyklingową.

Modular switches

Choose a modular switch according to the individual channels as well as the common parts of the assembly. The number of outputs describes the scope of control, but does not by itself determine the permissible simultaneous operation of loads. First create a list of loads and assign control signals to them. Then you can decide which circuits should be on one module and which require a separate solution.

Deciding between output principles

The range includes JR-4K, JR-4J, JR-4L and JR-8J. When comparing them, request the diagram and load conditions for each code. Distinguish between mechanical contacts, transistor outputs and thyristor switching. A resistive load figure does not fill in missing documentation for a solenoid or motor.

In the brief, also write the state of each output after the command is removed and after the power supply is restored. For common supplies, mark the group boundaries. If some part of the technology is to be operationally switchable independently, capture this requirement already when dividing the channels. Do not just go by how many free terminals remain.

Principle: control signal and switched energy

RELPOL data sheet RSR30 distinguishes a triac AC output and a MOSFET for DC. It explains different principles; its values are not parameters of the JR modules.

For each channel, prepare a pair of records: the required control signal and the switched circuit. The first includes the voltage, consumption and PNP or NPN configuration according to the specific module, the second the characteristics of the load.

Do not confuse input-to-output isolation with independence of all channels from each other. Verify the required coupling in the diagram and isolation data of the selected product. Record the actual common supplies in the cable list. This makes it possible to find out in advance whether the proposed division of circuits matches the module design.

Author's model example: simultaneous operation of eight branches

As a model, consider eight DC loads, each with a steady-state current of 0.25 A. In simultaneous operation, the common current is 8 × 0.25 = 2 A. If the control sequence allows at most three simultaneously active branches, the corresponding steady-state sum is 0.75 A.

The values are the author's assumptions, not parameters of JR-8J or other products. The smaller sum applies only if the restriction on simultaneous operation is actually observed. For the brief, therefore also capture start-up, manual mode and service testing, during which a different combination may occur. The calculation does not prove the current capacity of the board or the common terminals.

Mounting: common supplies and heat

OMRON's guidance for semiconductor switching emphasises temperature, heat dissipation and mounting position. Take the specific limits from the documentation of the chosen module.

In the layout, draw the common supply, outputs and position of the labels. For each operating scenario, mark the active channels. This record will serve as the basis for assessing simultaneous operation and for the acceptance test.

If you need to handle switching with individual devices, compare SSR solid-state relays and electromagnetic relays. Reflect the change of architecture in the diagram, markings and service list. Both a standalone device and a multi-channel module need documented conditions of use.

Diagnosing one channel and the whole group

First record the fault according to its extent: one load, several channels or the whole module. Then compare the moment of failure with the command, the common power supply and the operating mode. Such a record allows a specialist to design measurements in a targeted way. The input indicator is only a partial observation, not a complete functional test.

FAQ

Can I multiply the current of one channel by the number of outputs?

Such a product does not prove the permissible current of the common parts. You need the conditions of simultaneous load from the manufacturer.

Is the same control signal a guarantee of the same output?

No. Compare the input logic and the output principle separately, including the requirements of the connected load.

Pliki cookies na tej stronie

Techniczne pliki cookies są potrzebne do działania koszyka i zamówienia — są używane zawsze. Analityczne pliki cookies pokazują nam, których stron ludzie szukają i gdzie się gubią, i pomagają nam ulepszać sklep. Użyjemy ich tylko wtedy, gdy na to pozwolisz. Więcej w zasadach przetwarzania danych.